Change of purpose of an existing building, reconstruction, strengthening, superstructure in a boutique hotel and concert hall
Client: | Central Point Ltd |
Architecture: | Arch.Nikolay Simeonov,VAMOS Ltd |
Main contractor: | Greentech Engineering Solutions |
Subject: | Reconstruction of a former Music School in a boutique hotel |
Design: | Structures |
Main structural material: | reinforced concrete ,brick walls and metal structure |
Characteristics: | – the existing building is 6-storey / basement, ground floor and 4 floors / |
– reinforcement of existing reinforced concrete elements | |
– two new reinforced concrete beam slabs | |
– new metal spatial roof structure with intermediate level | |
Phase/stage: | in operation since 2018 |
PROJECTS
ABOUT US
“BIAS-M” is company that offers consulting services for high-rise, low-rise and specific buildings and structures.
CONTACT US
Phone: 02/ 920 07 97; 02/ 920 18 38; Fax: 02/ 822 14 45;
Mobile 0885 895 345
E-mail: office@bias-m.com