Предприятие за преработка на плодове и зеленчуци, с. Дагоново,общ. Белица, обл. Благоевград

Client:   БИООРГАНИК БЪЛГАРИЯ ЕООД
Architecture:   ПРОГРЕС ПЕРФЕКТ ДИЗАЙН ЕООД
Main contractor:   ДРАЙ БИЛДИНГ ООД
Plan dimensions:   60 / 45 m
Stories (overground):   2
Design:   Structures
CGA - Construction Gross (building) Area:   2 300 m2
Excavation with retaining structure:   non retaining open excavation with slopes and berms
Main structural material:   cast in place reinforced concrete, structural steel
Structural type system:   steel frame skeleton structure (columns and girders) + intermediate steelwork RC slab
Structural grid spacing:   12 / 6 m
Foundation:   ribbed mat foundation - cast in place RC footings (under columns and walls) with connecting beams
Roof - type & material:   steel structure gable roof
Phase/stage:   in operation since 2018
×