
Sofia Metro Extension Project, Third Metro Line - Botevgradsko Shosse Blvd. - Vladimir Vazov Blvd. - Central part of the city - Ovcha Kupel residential area, stage II with four metro stations; separate position № 2 - near MC 18 with 2 metro stations - working shaft for implementation of TU under NATM
| Client: | SOFIA MUNICIPALITY / "METROPOLITEN" Jsc. |
| Architecture: | BIAS-M Ltd, arch.Evangelina Sirakova |
| Main contractor: | METROBUILD WEST ASSOCIATION |
| Facility length: | 900 m |
| Design: | Complex design |
| Technologies and features: | - metro tunnel built by Top-Down method on slotted walls, monolithic reinforced concrete |
| - ventilation system (VU) - partially Top-Down, partially open method, monolithic reinforced concrete | |
| - tunnel section built in an open way from monolithic reinforced concrete | |
| Phase/stage: | in operation since 2021 |
PROJECTS


ABOUT US
“BIAS-M” is company that offers consulting services for high-rise, low-rise and specific buildings and structures.
CONTACT US
Phone: 02/ 920 07 97; 02/ 920 18 38; Fax: 02/ 822 14 45;
Mobile 0885 895 345
E-mail: office@bias-m.com